Concurrent engineering of space missions
ENG-411
Tentative list of progress to be made during the s...
This page is part of the content downloaded from Tentative list of progress to be made during the s... on Monday, 30 June 2025, 15:39. Note that some content and any files larger than 50 MB are not downloaded.
Description
Tentative list of progress to be made during the session:
- Preliminary budget at system level (top down)
- Subsystem design (bottom-up)
- Subsystem budgets, main risks
- First complete iteration with publication to COMET !!
- Update slides for the intermediate presentation